|
|
7
|
Removed and then put returned or replaced
|
10
|
Grid pattern reinforcing for basement
|
13
|
Additive to increase work-ability of concrete
|
14
|
Additive to allow concrete exposed to the elements to expand and contract
|
15
|
Between the foundation wall and the basement slab
|
16
|
Drainage used around the footings
|
18
|
Promotes the evacuation of water next to the foundation wall
|
19
|
Temporary structure to hold the concrete until it cures
|
20
|
Prevention of water infiltration through foundation assemblies
|
21
|
Under various components to prevent capillary action
|
22
|
A pyramid with the top cut off
|
23
|
Under the foundation wall to transfer load to the earth
|
24
|
Factor for what happen to material over time
|
25
|
supported by the strip footing
|
27
|
Factor for what happend to matterial as it is disturbed
|
29
|
Footing detail to lock in the foundation wall
|
|